A 16-storey apart-hotel run by Marriott is set to replace the Nakhon Thai restaurant in Silvertown, after Newham Council approved the plans.
The council’s Strategic Development Committee approved the application for 1 Dock Road on 16 November 2026. The scheme will have 234 apart-hotel rooms, along with commercial space and improvements to the surrounding public areas.
The existing restaurant building will be demolished. The new building will have a restaurant and café on the ground floor, on a similar footprint to Nakhon Thai, but its operator is not yet known. The officers’ report said losing the established restaurant was acceptable, because the scheme keeps some commercial space and brings extra jobs and wider economic benefits.
The apart-hotel will be run under StudioRes, a new Marriott brand that the applicants described as its longest-stay hotel brand. Rooms will have kitchenettes, and hotel services will include a 24-hour reception, concierge, cleaning and linen changes.
The scheme is intended to support regeneration of the Royal Docks and boost the local visitor economy.

Stays of up to a year
Guests will be able to stay from one night to 12 months. The committee chair, Councillor Rachel Tripp, was concerned this could blur the line with housing. “By the time you have someone staying in an apart-hotel with kitchen facilities and they could be staying there up to a year, it starts to feel an awful lot like… a normal term rental,” she said.
The applicants said StudioRes is aimed at a mix of tourists, business people on assignments of three to nine months, and families or households relocating or moving to a new city. They said it would fill an “interim gap” while people find long-term homes.
A planning condition bans any guest from staying for more than 12 months in a row. An apart-hotel management plan, secured through the Section 106 legal agreement and required before the hotel opens, must explain how the limit will be monitored, including a register of guests’ arrival and departure dates. An officer said these controls would ensure the building does not become permanent housing.
Neighbours and the beach
Councillors raised concerns about daylight and sunlight for neighbours, particularly at Western Beach Apartments, and about overshadowing of the popular Dock Beach.
At Western Beach Apartments, 81 of 106 windows would meet daylight guidelines. The other 25 are already limited by existing balconies. Officers said the impact on Dock Beach would be negligible, with at least 95% of it still getting two hours of sunlight on 21 March. They concluded there would be no unacceptable harm to neighbours.

Transport and parking
The development will be car-free apart from one blue badge parking space. It will have 51 cycle parking spaces and a framework travel plan to encourage sustainable transport.
Councillor Blossom Young asked whether one blue badge space was enough for a 234-room hotel. Officers said it met policy, and that 10% of rooms, about 23, would be adapted for accessibility. Use of the space will be monitored through the travel plan.
The space will be 60 metres from the hotel entrance, further than the 50 metres guidance recommends. Councillor Rob Callender raised this, along with a possible clash between the planned loading bay and a proposed bus gate. Officers said the distance was not unacceptable, and a bench will be provided so people can rest. The applicants said the location was constrained by the Silvertown flyover.
The council’s Transportation Team broadly supported the arrangements, subject to highway improvements and planning obligations. Through a Section 278 agreement, the developer will change car park entrances, reconfigure parking to create the blue badge space and add a new loading bay on Dock Road. All of this must be finished before anyone moves in.
The developer will also pay a £2,000 fee for car-free development and £10,530 towards the travel plan, made up of a £5,265 monitoring fee and £5,265 in contributions. The travel plan money will rise with inflation and is secured through the Section 106 agreement.
£167,000 trade-off
Transport for London (TfL) raised concerns about whether there would be enough cycle parking, how accessible the blue badge space would be, and the impact of extra trips on the DLR. It asked for about £620,000 towards DLR improvements, such as step-free access at West Silvertown station, and £200,000 for a cycle hire docking station.
The developer disputed both requests. The officers’ report said the applicant questioned how the DLR figure was calculated and whether it was proportionate, and suggested a lower amount. The applicant also did not accept that a cycle hire contribution was needed. The public transport contribution is still to be agreed between the applicant and TfL.
To help make room for the DLR contribution, the council agreed to cut the developer’s contribution towards employment and skills from £667,000 to £500,000. “The original calculation was 670k, based on 540 construction jobs,” an officer told the committee. The agreed £500,000 is based on about 400 construction jobs. In return, the applicant offered more apprenticeships. The officer said that although the council had lost £167,000, local residents would gain more jobs, particularly hospitality apprenticeships.

Jobs and community
The council now estimates the development will create about 400 construction jobs, down from the 540 used in its original calculation, as well as 30 permanent jobs. The applicant’s own estimate was much lower, at 100 construction jobs on site. The council’s Newham Work Team considered that figure low for a scheme of this size, and Cllr Young questioned the gap.
The £500,000 Section 106 contribution will come with local labour targets and apprenticeships.
Jake Loftus, founder and chief executive of the applicant, General Projects, said the building would open itself up to the public. He said there would be “a restaurant, dockside hospitality and spaces for local people to gather, including a rooftop growing space, which will offer community workshops on growing food and nutrition”. The applicants also plan bookable community spaces.

Planning conditions secure the rooftop space and its landscaping. However, the community workshops and public access are the applicant’s intention, rather than a requirement of the legal agreement.
The building’s design takes inspiration from the docks’ historic warehouses. Its scale, massing and materials were revised after review by the council’s Design Review Panel.
The plans include landscaping, rain gardens and green walls. One mature London plane tree will be removed and four replacement trees planted. Mainly because of the lost tree, the scheme currently shows a small net loss in biodiversity of 0.06 habitat units. The developer will make this up by buying off-site biodiversity units or statutory biodiversity credits. Details will be set out in a Biodiversity Gain Plan secured by a planning condition. Cllr Young questioned the reliance on off-site measures.
The committee voted to approve the application. The application will now be referred to the Mayor of London. Once a legal agreement is completed, the Director of Place Making will be able to grant planning permission.