A council-owned company has won approval to build 138 homes on a Romford car park, none of them affordable.
Havering Council's Planning Committee voted 5-0 on 26 November 2026 to approve the scheme at Como Street car park, two months after delaying a decision in September. The developer, Mercury Land Holdings, is wholly owned by the council, which also owns the land.
The plans include three terraced houses and three apartment blocks of between three and nine storeys, with 522 square metres of flexible commercial and community space.

Objectors raised concerns about the height and scale of the buildings, overlooking and loss of privacy, traffic and parking, and the lack of affordable housing. They also opposed the loss of the 141-space public car park and the extra pressure on local services. The council received 161 representations, 121 of them objections, and Romford MP Andrew Rosindell urged the committee to refuse the plans.
Speaking for residents, Hazel Heptonstall claimed Reform councillors had promised before the May elections not to approve high-rise development on the site. Ward councillor Terry Brown called the design ugly
and said it would harm a Grade II listed building 15 metres away.

Officers accepted the scheme would cause less than substantial
harm to the setting of that listed building, and that the nine-storey block exceeds the four-to-eight storeys suggested in the Romford masterplan. But they said the benefits outweighed the harm.
During consultation, the tallest building was cut from 14 storeys to nine. The scheme will be car-free. Residents will not be able to get parking permits but there will be blue badge parking and two car club spaces, and cycle stores will be on the ground floor of each block, with separate storage for the houses.
Part of the River Rom alongside the site will be restored to a more natural state. The vertical concrete wall will be removed and replaced with a sloped, terraced bank, with planting trailing into the river. An extra planted terrace will go in the high-flow channel, with coir rolls in the low-flow channel to encourage aquatic plants and improve biodiversity. The developer must show it has achieved the greatest possible length of natural bank.
No affordable housing is included because an independent review found the scheme would run at a deficit of about £16.4 million. The legal agreement includes two reviews that could still secure affordable homes. An early review if the development is not substantially under way within an agreed period, and a late review when 75% of the homes have been sold.
The developer will also pay towards local infrastructure, including £179,909 for health, £852,377 for school places, and £138,000 for the ring road, plus other highways improvements.
The NHS said the scheme on its own may have a neutral effect on local health services, but that the combined effect of many developments could have a major negative impact. Council education officers estimate the homes will add 25 primary pupils, 8 secondary pupils and 3 post-16 students.
Conditions of approval:
- Work must start within three years
- Construction hours are limited to 8am to 6pm on weekdays and 8am to 1pm on Saturdays, with no work on Sundays or bank holidays unless agreed in writing
- All construction vehicles must use North Street only, with banksmen at the junction of North Street and Como Street
Before work starts, the developer must agree:
- a construction plan to protect wildlife
- a construction traffic plan
- a dust management plan before any demolition
- a plan to improve the riverbank
- a piling and foundation method statement before any piling. Following an amendment at the meeting, this must protect all neighbouring properties, not just homes.
- Trees must be checked for bats before they are felled
- Before anyone moves in, the developer must agree a delivery and servicing plan and a final travel plan
Other conditions cover:
- Boundary treatments and lighting
- Contamination, air quality, noise and vibration
- Electric vehicle charging and energy, including maximising solar panels; habitat management, landscaping and road safety audits
The commercial space is restricted to Use Classes E(a), E(b), E(c), E(e) and F2(b). All homes must meet water efficiency standards, and at least 10% must be wheelchair user homes. The scheme must follow the approved Fire Statement Version 2.
The application came with a Preliminary Ecological Appraisal, and the council concluded the scheme was acceptable with the right mitigation in place. 